亚洲精品福利网站-丁香婷婷九月-日本wwww色-男人的天堂免费视频-看免费毛片-一区二区在线视频观看-偷拍视频一区-精品美女视频在线观看免费软件-免费精品一区-久久久夜色-一级片网址-成人公开视频-开心激情婷婷-精品视频网-久久99精品国产-黄色在线播放视频-黄在线网站

  • Shandong lifting machine project

    Shandong lifting machine project

    13615481234

    Business nature: production-oriented

    Contact: Manager Wu

    Phone:0538-7431089

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more about product information

    Product Company Profile Location

    Information Details

    Shandong lifting machine project

    Beam lifting machine

    Product Introduction

    The beam lifting machine can be used to lift prefabricated beams in combination with two cranes, or a single crane with dual lifting devices can be used to lift prefabricated beams. The lifting capacity of two lifting machines at the same time is generally 450 tons, and the lifting capacity of a single lifting machine can usually reach 900 tons. It is equipped with leg walking, overhead crane walking, and overhead crane lifting equipment, which can achieve all-round mechanized movements. Mainly used to lift prefabricated beams from the beam making platform to the beam storage platform, and after the maintenance of prefabricated beams is completed, they are lifted from the beam storage platform to the beam transport vehicle. As a lifting equipment, complete the assembly and disassembly of the bridge erecting machine. It is also used to construct dry bridges with low pier height.

    technical requirement

    1. Improve the positioning accuracy of prefabricated beams and reduce the impact on the structure of the lifting machine by lowering the operating speed of the lifting and running mechanisms.

    2. The internal space of the lifting machine should be large enough to meet the assembly needs of lifting prefabricated beams and bridge erecting machines.

    3. The main steel structure should be considered for disassembly and transportation while meeting the requirements of strength, stiffness, and stability.

    When using two cranes to lift prefabricated beams, it is necessary to ensure that the two machines operate synchronously.

    operation and maintenance

    1. Operators must undergo training and be qualified before they can take up their posts.

    2. Strictly follow the operating requirements and steps.

    3. Regularly inspect and maintain mechanical and electrical devices.

    4. If any problems are found, the machine should be stopped for inspection until the problem is resolved.


    Shandong lifting machine project 2019-7-25 This article has been read 843 times
    Previous:Container crane projectNext:Qualification and Honor


    Related Information


    Service Hotline

    13615481234

    Contact: Manager Wu

    13615481234 (same WeChat account)

    Q  Q:2824483966

    Phone: 0538-7431089

    Email: gm@honfucrane.com

    website: www.qzren.cn

    Address: Yangliu Industrial Park, Xintai City, Shandong Province

    Add friends to learn more

    about product information

    Copyright ?: Shandong Qilide Heavy Industry Group Co., Ltd                  technical supportPublicity Information魯ICP備16026539號-7

    惠来县| 延安市| 抚顺县| 贡山| 沈阳市| 榕江县| 牙克石市| 洛隆县| 景谷| 阳泉市| 三门峡市| 丹凤县| 浙江省| 宿松县| 武穴市| 布拖县| 威远县| 星座| 淳安县| 锦州市| 昭平县| 古田县| 东安县| 金堂县| 全州县| 福泉市| 玛纳斯县| 新宾| 凭祥市| 达州市| 荔浦县| 通海县| 景洪市| 迁安市| 江都市| 肥东县| 巧家县| 长岭县| 阜新市| 东港市| 四川省|